Cost to Build: We are very affordable in construction, where we have been building hospital in 1500 rs + GST per sqft. This cost is indicative and will depend on schedule of finish and cost of input material like sand, aggregates, cement and others. Cost Indicated Included as standard building what a typical Flats/ Apartment builder offers. Cost of Lift, HVAC ,DG, Façade, equipment, is additional.

  1. Time to Construct: This is a very important factor as this will affect overall cost of the building. Generally, time to construct should be less than 12 months. Investment starts from the day we buy land or start planning, and as it takes more time to start earning from the facility, the more interest cost/ opportunity cost we incur. Thumb rule costing is, on Land: 30 % , Building 35 % and Equipment 35 %. So, taking 100 % Upfront investment in Land and a time to build 12 months with spending spread equally over 12 months on building, keeping equipment out of this calculation (as most of it is bought at the end of construction), Interest cost per sqft of build up space will be around 300 rs/ sqft, if the construction is completed in 12 months. Hence, if the construction times stretches to 2 years then it will be around 600 rs/sq ft.
    Time to construct can also be important from a “first mover advantage” point of view. Say, fist one in the region to have a cardiology hospital, or radio oncology (cancer hospital).

2. Quality of Construction: Not to emphasize on the need to maintain quality, which ultimately reduces maintenance cost , give a superior patient experience and increased building life.
Our team have qualified Quality assurance persons, for maker and checker controls.

3. Do it right First Time: As hospitals are complex building specially with the utility services like, Electrical: have to run 3 different power supplies (Grid , generator and UPS to critical equipment’s), Plumbing lines (DM water for Dialysis, RO for Drinking, general use water) and sewage lines to STP any in some area require to recirculate treated water for reuse, Medical gas & Vacuum lines, Communication lines (telephone, LAN, CCTV), Fire lines, Central Ducting system. There are a lot of coordination issues, and most of the time involve breaking and rebuilding. It is observed that on an average 2 % of the cost goes in breaking and rebuilding. Many time some utility is completely missed and added once the hospital starts. Not to highlight time overrun due to this.
Our Experienced will help save on these wastages and bring down over all cost and time to go live.

4.Specialist Team for Specialised work: We have dedicated team for Civil, Electrical, HVAC, Medical Gas, Fire and other services, with an overall Project manager for coordination and quality assurance persons. With our experience of over 7 years and a number of hospitals constructed, the team have been well trained on hospital requirement. With experience the team is well coordinated to build hospital, faster, better finished and no rework.
5.Cost to Build: We are very affordable in construction, where we have been building hospital in 1500 rs + GST per sqft. This cost is indicative and will depend on schedule of finish and cost of input material like sand, aggregates, cement and others. Cost Indicated Included as standard building what a typical Flats/ Apartment builder offers. Cost of Lift, HVAC ,DG, Façade, equipment, is additional.